Design and Project Management for the whole AIRTEL Data Center in Pointe NoireEngineering Procurement and Commissioning for the following systems: Raised Floor, FM 200, Fire Alarm, HSSD, Water Leak Detection, Environment Monitoring, BMS, Fire Proof Doors, IP Based Camera Surveillance, IP Based Access Control, LAN Copper Pre-terminated Cables and cable trays, LAN Fiber Pre-terminated cables and Finer runners, Network Racks

Full Turnkey Design, Engineering, Procurement and Commissioning of the data center in Freetown. Project Started with AIRTEL and handed over with ORANGE. Project included civil works, Project included civil works, power distribution and electrical cabling, UPS systems and batteries, FM 200, Fire Alarm, Fire hydrant for the site, Camera Surveillance, IP based access control, and Diesel Generators

Price Simulator is a software tool that allows ETISALAT to model complex pricing scenarios with drag-and-drop ease, ensuring margins are in line with corporate objectives before new services are launched. It is a software that reads the data of the consumers in the database and runs certain algorithms that propose for the operator the best package that fits each consumer. The tool implemented by REDKNEE in coordination with CONCIEL.

Supply and Implementation of customized ERP solution DIRIGO from CONCIEL. Used by APAVE for their internal workflow, in sales proposal preparation, invoicing follow-up with clients, Human Resources, Performance Appraisal and project management. In addition, CONCIEL implemented MAINTA CMMS for APAVE clients in the oil and gas sector

Assaluyeh Iran phases 6,7&8; Supply, implementation and training of CMMSEDMS and RBI. The project included 3 business applications and their interface together CMMS (www.mainta.com), EDMS (www.filehold.com), and RBI (www.credosoft.com) for the asset and inventory maintenance operations. The end user is SPGC and POGC (phases 1-10) offshore.

Petropars Operation and Maintenance Company; gas operation and Maintenance Company in Assaluyeh Iran; project management and coaching on the data collection and entry for the CMMS EDMS RBI systems and scheduling of the preventive maintenance modules.POMC was subcontracted by PETROPARS to do data collection and entry in the applications. end user is SPGC and POGC

Diesel Generators production: Supply and implementation of DIRIGO ERP and workflow software used for their production and maintenance operations in Nigeria. used for the invoicing, accounting and finance, maitnenace orders, production and inventory in multiple warehouses.

Design and technical writing of the processes and procedures for the water laboratory management system (ISO 17025) included water monitoring, sampling and field testing, laboratory testing, emergency complaints, data analysis, maintenance and calibration

A leading company producing all kinds of grains, spices and pickles; consulting, implementation and training on the food safety system (ISO 22000:2005) inluding Production, Facility Management, Storage, Human resources and quality